Product Details
Place of Origin: GUANGZHOU/CHINA
Brand Name: PUNAISGD/CABLEPULS
Certification: ISO/CE/ROSH
Model Number: GYXTS-12B1.3
Document: Product Brochure PDF
Payment & Shipping Terms
Minimum Order Quantity: 2km
Price: negotiable
Packaging Details: Wooden Spool /drum
Delivery Time: 5-25days
Payment Terms: 30%TT as deposit,70%Balance before shipping.
Supply Ability: 100km
Item No.: |
GYXTS-12B1.3 |
Armored Type: |
Steel Tape |
Strength Member: |
Steel Wire Surround |
Jacket Material: |
PE |
Application: |
Pipeline |
Warranty Period: |
25 Years |
Item No.: |
GYXTS-12B1.3 |
Armored Type: |
Steel Tape |
Strength Member: |
Steel Wire Surround |
Jacket Material: |
PE |
Application: |
Pipeline |
Warranty Period: |
25 Years |
GYTA33 fiber optic cable The structure of the GYTA33 optic cable is to sleeve the optical fiber into the PBT loose tube and fill with the thixotropic
compound. The central reinforcement of the cable core is a steel wire (a large core number structure optical cable needs to be extruded with a layer of PE cushion), and the loose tube is twisted around the central reinforcement by SZ stranding. The gaps in the cable core are filled with water-blocking compounds. The outer sheath is armored with a single thin round steel wire and extruded with a layer of polyethylene outer sheath
Fiber count |
Nominal Diameter (mm) |
Nominal Weight (kg/km) |
Max fiber Per tube |
tube Diameter (mm) |
Allowable Tensile load Long/short (N) |
Allowable Crush resistance Long/short (N/10cm) |
2-6 | 6.8 | 60 | 2-6 | 2.5 | 1000/600 | 600/300 |
8-12 | 7.3 | 70 | 8-12 | 3.0 | 1000/600 | 600/300 |
14-24 | 7.8 | 83 | 14-23 | 3.6 | 1000/600 | 600/300 |
> 24 | Available upon customer' s request |
Production Supplier Profile
How do I place an OEM or customized order?
1) Send your purchase intention to our email: cotton@fibercablepuls.com
2) Our sales team will contact you to confirm the product specification, packaging, printing, quantity,
and other specific information.
3) Sign the contract or Proforma Invoice.
4) After receiving your deposit, we will start to arrange the production.
5) 2 weeks before the completion of production, we will notify you to start contacting shipping.